RMC PACIFIC MATERIALS FACILITY RELOCATION PROJECT
FINAL ENVIRONMENTAL IMPACT REPORT
NOTE: Adobe Acrobat Reader is required to view the files below.
COVER/TITLE
TABLE OF CONTENTS
DOCUMENT:
Section 1.0 - Introduction
Section 2.0 - Executive Summary
Section 3.0 - Written Comment Letters
Section 4.0 - Responses to Written Comment Letters
Section 5.0 - Minor Changes and Edits to the Draft
Section 6.0 - Report Preparation
FIGURES:
SECTION 2
2-1 Regional Location
2-2 Aerial Site and Vicinity
2-3 Existing Cement Terminal Location
SECTION 5
3-1 Overall Site Plan
3-2 Detailed Site Plan
4 Project Area Viewshed
5 Photopoint 1 – Southport Boulevard
6 Photopoint 2 – Southport Boulevard
7 Photopoint 3 – Yolo Causeway
Exhibit A Cement Terminal Flow Schematic
Exhibit D Ship Dock
Exhibit E Ship Dock Cross-sections
APPENDICES:
A - Human Health Risk Assessment
This Document Was Created By:
AES - Analytical Environmental Services 2021 "N" Street, Suite 200 Sacramento, CA 95814 Phone (916) 447-3479 Fax (916) 447-1665 www.analyticalcorp.com